Project Overview
Contractor
Willmott Dixon Construction
Client
Leicester University
Location
Leicester
Duration
38 Weeks
Value
£4,900.000 million
Sector
Education
George Davies Centre. Leicester University.
The UK’s largest low-energy, Passivhaus building
Metropolitan Formwork worked with Willmott Dixon on the construction of the £42m George Davies Centre for Leicester University’s School of Medicine. Sustainability was an important priority for this building. In fact, the extremely low-energy design contributes to its status as the UK’s largest Passivhaus building.
In practical terms, this means the energy consumption of this six-story building is expected to be just 80kWh/m² (compared to the previous facility’s 500kWh/m²). This could reduce the energy bill by up to six times.
Scope of works included:
- Exposed concrete finish
- 6 storeys
- Post-tensioned concrete floors
- In-situ reinforced concrete cores, walls and columns
- Associated substructure works
- Ischebeck Titan and Doka formwork/falsework
CONCRETE